In three desilting tunnels of Xiaolangdi Multipurpose Project, over 70% tunnel wall were lined with non cohesive pre stressed concrete by the post tensioning method.
英
美
- 小浪底水利枢纽工程的3条排沙洞,洞身70%25以上采用后张法无粘结预应力混凝土衬砌。
