In view of the problems on filling technic occurring in underhand drift cut-and-fill sloping in Kelatongke Copper-Nickel Mine, Xinjiang, a study on the technic of cemented filling with tailings and Gobi aggregate has been carried out.
英
美
- 摘要针对喀拉通克铜镍矿在下向进路胶结充填采矿法充填工艺所存在的问题,开展了尾砂与戈壁集料胶结充填工艺技术的研究。