It introduced the framework bridge jacking beam and analyzed the control point and measures of embedded muscle process.

  • 介绍了朔黄铁路框架桥顶进后悬臂板、刃角补墙及尾墙的施工方案,分析了植筋施工中工序的控制要点和具体措施。
目录 查词历史