Kroll Ehud,Carver Brad S.Disassembly analysis through time estimation and other metrics[J].Robotics and Computer-Integrated Manufacturing,1999,15(3):191-200.

  • 高建刚姚丽英段广洪汪劲松.;机电产品拆卸序列的生成与评价[J]
目录 查词历史