Manufacture and deliver the Equipment within twenty-two (22) months from the Effective Date of the Contract on DEQ parity as defined in Clause3.1.
英
美
- 自本合同生效日起贰拾贰(22)个月内生产制造并按3.;1条中规定的DEQ价格术语完成生产线设备的交运;