您要查找的是不是:
- Master Test Station 主试验台
- The using and application of capacitors in the test station o. 介绍了电容器在变压器厂试验站的配置及使用情况,并举例加以说明。
- The test manager draws up the master test plan during the Inception phase. 测试经理在先启阶段草拟主测试计划。
- Follow all test station on SMT line in the factory, solve all SMT test problem. 跟踪工厂SMT线所有的测试工位,解决测试问题。
- The test station has been appraised and checked,and has been put into practice. 本试验台已通过鉴定和验收,并已投入实际运行中。
- Power facilities repairing and testing station. 电力公司修试所
- RUP uses a master test plan for the overall project and an iteration test plan per iteration. RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。
- The master test plan and a detailed planning of test effort should be all that is produced prior to test execution. 主测试计划和测试工作的详细计划,应当是在测试执行之前所产生的所有文档。
- In any case, the master test plan needs to ensure that the ST and AT are complementary with regard to test coverage. 无论如何,主测试计划需要确保,系统测试和验收测试是有关测试覆盖的补充。
- The required organization is part of the template for the master test plan and the iteration test plan, but the corresponding activity is unclear. 需要的组织是主测试计划和迭代测试计划模版的一部分,但是相应的活动不清楚。
- Optical Test Station OptiCentric for centration measurement, cementing and alignment of optics. 光学定心检测平台。
- The development and enforcement of the guidelines is the shared responsibility of the process engineers and should be consistent with the master test plan. 指南的开发和执行是过程工程师们的共有责任,并且应当是与主测试计划是一致的。
- Bring forward any dissidence(disagreement?) about the test report to the test station within a month.No transacting if the time limit is exceeded. 对于检验报告若有异议,应于发出报告之日起一个月内向检验单位提出,过期不予受理。
- Its main contents include the following. Why would a Master test a disciple by having him build and demolish houses repeatedly over seventy times, just to select a successor? 主要开示内容包括:一位大师为了遴选继承人,一再地考验徒弟,不断拆建房子,前后达七十次之多,结果如何?
- Maintain all test stations and listening equipment and cables. 维护所有测试配置和听音设备及电缆。
- How do I tell what version of Test Station Software(TSSW) and what levels of patches are installed on? myTest Station? 如何了解我的测试站上安装了什么版本的测试? 救砑?TSSW)和什么程度的补丁?
- One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test. 一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。
- Follow all test station on SMT line in the factory, solve all SMT test problem. 跟踪工厂SMT线所有的测试工位,解决测试问题。
- In operational application range, several portable test station workable, no need to any wire connection required. 有效距离内可安装多台测试点,测试点可依不同需求移动/改变位置,不必另外配线。
- Bergans’ product test station is located at the summit of Gaustatoppen (1833m) near Rjukan, in the Telemark region. Bergans的产品测试基地坐落在Rjukan附近的Gaustatoppen(1833米)山顶上,属于 Telemark区域。