Means of overflowing from dam top and ski-jump energy dissipation are adopted by this arch dam.The plunge pool of three rigs is of new type and has good dissipation function.

  • 拱坝采用坝顶溢流挑流消能型式,设置新型的三坎式水垫塘,消能效果良好。
目录 查词历史