Much of 1997 was spent in the detailed planning of the project, which includes overall rationalisation of the berths at Kwai Chung and Tsing Yi.
英
美
- 一九九七年,当局用了许多时间详细规划该项工程计划,包括重新分配葵涌及青衣的泊位经营权。