您要查找的是不是:
- This paper show the brief introduction the Nanjing Metro Line 1 and the environment along the line, analyze the problems in the design and the construction stage. 摘要介绍南京地铁1号线一期工程线路概况及沿线环境特点,通过实例对线路设计中的经验和后期施工过程中发生的问题进行分析。
- The Bidding Works in the Project Construction of Nanjing Metro Line 1 First Stage 南京地铁1号线一期工程施工的招投标工作
- Analysis on Major Issues of Main Transmission System of Cars for Nanjing Metro Line 1 南京地铁1号线车辆主传动系统问题分析
- Nanjing metro line 1 通信
- Shanghai South Railway Station of Metro Line 1 was moved entirely in 2004. 摘要上海轨道交通1号线上海南站站于2004年顺利整体入地搬迁。
- Take Metro Line 1 to Shaanxi Nan Lu, Exit 4. Turn right into Maoming Lu, turn left into Nanchang Lu. 座一号线到陕西南路站,从四号出口出去,右拐到茂名路,再左拐进南昌路。
- The significance of the Tianjin metro line 1 and its general rout situations are introduced in detail. 详细介绍了天津地铁1号线工程建设的意义及线路概况。
- West - Mentougou District: from the Shijingshan, Haidian the past, the choice of Beijing Metro Line 1. 西-门头沟区:离石景山,海淀近,进京可选择地铁1号线。
- Cracks have appeared on the bogie frame of Shanghai metro line 1 following its operation. 摘要上海地铁1号线动车在使用几年后其转向架构架齿轮箱吊座就开始产生裂纹。
- The fault diagnosis model of Metro line 1 rolling stock is initially established by combing the signal syntagma and the diagnosis logical diagram. 将信号结构体和诊断逻辑图相结合,初步建立了1号线列车的故障诊断模型。
- Caused by the ever increasing passengers, the transport capacity in Shanghai Metro Line 1 is becoming more and more limitable. 摘要介绍了上海地铁1号线目前的运营状况,并分析预测了其客流增长情况及发展趋势;剖析了运能紧张的状况并就应对措施进行了探讨。
- The paper gives a brief introduction on structures of the main equipment,system functions,system interface,reliability and availability of TWC system of Teheran Metro Line 1 & 2. 本文对德黑兰地铁1、2号线 TWC 系统的主要设备构成、系统功能、系统接口和可靠性及可用性进行了简要介绍。
- After to the comprehensive and thorough commissioning and integrated test, the operation of Guangzhou Metro Line 1 achieved the goal of thorough and high level operation. 摘要广州地铁1号线由于进行了全面细致的调试与联调,从而达到了一次性全面和高水平的开通。
- The reconstruction project of Shanghai Metro Line 1 is carried cut in accordance with the master plan of the South Station, construction subsequence, signal reconstruction plan and vehicle operation organization. 摘要介绍了上海轨道交通1号线上海南站站改建工程的总体设计方案、施工拨接计划、施工顺序、信号改造过渡方案、列车运行组织以及施工拨接的全过程。
- Shanghai's local transport system was launched with the Shanghai Metro Line 1, which operated 16 six-car units supplied by the German Shanghai Metro Group (GSMG) consortium led by Bombardier from October 1992 to April 1995. 简要翻译一下第一段,英语水平有限哈:上海地铁1、2号线,中国上海的本地交通系统是由地铁1号线引领开始的,它是由16列6节编组的由庞巴迪领导的德国上海地铁集团(GSMG)财团提供的车辆运转的,从1992年10月到1995年4月。
- This paper summarizes the results of researches on track vibration damping and noise reduction for Tianjin Metro Line 1, such as the new-type high-elastic vibration damping fastening and block sleepers with rubber-plastic boots. 摘要在天津地铁1号线轨道系统中,采用新型高弹性减振扣件、新型橡塑套靴弹性短轨枕等减振降噪的创新技术。
- Based on a brief analysis of E &M equipment of Guangzhou Metro Line 1, the author makes an introduction of the aim, significance, plan, organziation, implementation and achievement of the commissioning and integrated test. 在简介机电设备系统的基础上,对调试与联调的目的、意义、计画、实施、组织、成果等方面作了扼要的介绍。
- Design works of Nanjing Metro started in 1999. 1999年开始进入南京地铁设计工作。
- Schedule Control in System Integrated Test in the First Stage of Construction of Nanjing Metro Line 号线一期工程系统总联调的进度控制
- Rail Base Slop Renovation in Guangzhou Metro Line 1 广州地铁1号线曲线钢轨轨底坡的调整