New Austrian tunneling method was adopted for the primary support,secondary permanent lining and grouting treatment,and the convergence survey was performed after the primary support.
英
美
- 对此类围岩采用“新奥法”施工方法,即一次支护,二次永久衬砌施工和灌浆处理,并在一次支护完成后进行了收敛量测。