On the basis of the results obtained from numerical simulation,the sizes of room stope and pillar stope and the material ratio for cemented tailings backfilling have been optimized and determined.

  • 根据计算结果,优化确定了尾砂胶结充填体的配比及采场矿房矿柱的尺寸。
目录 查词历史