您要查找的是不是:
- The project manager controls the assigned project resources to best meet project objectives, while the PMO optimizes the use of shared organizational resources across all projects. 项目经理控制分配给项目的资源,以便最好地实现项目目标,而项目管理办公室在所有的项目中以最优的方式使用共用的组织资源。
- Optimize the project resources 优化项目资源
- Objective of this phase is to study all alternatives, optimize the project in all domains (strategy, market, resources, legal aspects, environment, financing) by demonstrate the overall feasibility, evaluate the risks, and recommend one alternate. 该阶段的目的是通过对所有的可能情况进行论证;风险评估以及备用方案提出等方式来对所有被选择项目进行研究;在各方面优化方案(策略;市场;资源;法律方面;以及环境;财务).
- If everyone does his part, the project will surely be a success. 如果大家都尽责,这个项目肯定会成功。
- The project as being undertaken on a small scale. 这个工程在小规模地进行着。
- The project was viewed favorably by the committee. 那计划受到该委员会的好评。
- The project is far from perfect. 这项企划很不完美。
- You must employ someone to oversee the project. 你得雇个人监督这一工程。
- The project is not finished but is till in process. 该项工程尚未结束,仍在进行之中。
- When you compile the project, both the report and its wrapper class are embedded into the assembly, the same as with any other project resource. 编译项目时,报表和其包装类均会被嵌入到程序集中,与任何其它项目资源一样。
- The DESS can’t optimize the project of the tugboat allocation, So it must run the simulation program with many allocation projects, and get the best project after evaluating all the project outcome. 离散系统仿真并不能得出最佳方案,需要对多种拖轮配置方案进行仿真运行,得出各种方案的仿真运行结果后,再对结果进行评判,选出较优的方案。
- I will join in the project, heart and hand. 我会满腔热情地参加这项工程。
- The government has ratified the project. 政府已经批准了这个项目。
- The project is financed by a charitable trust. 这项工程是由慈善基金机构赞助的。
- Optimize the selection of components. 优化产品零部件的选择。
- The project is running into financial difficulties. 这一项目遇到了财务困难。
- Optimize the strategy parameters. 优化策略的参数。
- The project ran into difficulties. 这项工程遇到了困难。
- With the help of PowerStow Container Stowage Coordination, you can instantly determine the projected work distribution per crane at any downline port, enabling terminals to optimize the crane split. 有了PowerStow集装箱配载协调系统,人们可以即时决定下游任意港口各起重机预计的工作分配,支持码头优化起重机的工作安排。
- The project was completed ahead of the schedule. 这项工程提前完工。