Procedures of the following aspects should be reviewed: the sub-contracting system; site inspection; the effectiveness of inspections and tests; and the monitoring work conducted by an independent third party.

  • 这方面涉及的问题包括:分判制度;地盘实地的巡查;检验及测试的成效;以及由独立第三者所进行的监察。
目录 查词历史