您要查找的是不是:
- Program Evaluation Factor 计划估计要素
- Ensures that a program evaluation is conducted. 确保培训评估工作的顺利进行。
- Through the harangue, pass overall program evaluation consistently. 经过热烈的讨论,一致通过总体方案评审。
- Also sometimes called a PERT (Program Evaluation and Review Technique) chart. 有时也称为PERT(计划评估与评审技术)图。
- Conduct site inspections and program evaluations. 进行现场视察和项目评估。
- The article uses the fuzzy method to set up an evaluation index system of accountor,the evaluation factor set and weight set of it. 应用模糊数学的方法,通过确立会计人员综合素质的评价指标,建立了指标体系的模糊评价因素集和权重集。
- Social Network Analysis In Program Evaluation: New Directions For Evaluation, No. 网络分析:评估进展新方向。
- Results show that AHP adapt to judge the weight of each evaluation factor and intergraded to quantificational and qualitative in evaluation of farmland productivity. 以宁乡县为例,根据耕地资源特点及耕地地力评价的原理,采用层次分析法确定耕地地力评价因子的权重。
- Evert. Vedung Public Policy and Program Evaluation Transaction Publishers Feb 2000. 转引自.;面对权力的规划
- This paper describes the application potential and the feasibility of program evaluation and review technique in application software development. 本文论述了计划评审技术(PERT)在应用软件开发中的应用价值和可行性。
- Gredler, M. E. (1995) . Implications of Portfolio Assessment for Program Evaluation, Studies in Educational Evaluation, Vol. 21.pp.431-437. 比尔·约翰逊:《学生表现评定手册》,李雁冰主译,华东师范大学出版社2001年版,第71页。
- Royse, D., Thyer, B.A., Padgett, D.K., &Logan, T.K. (2001). Program evaluation: An introduction. Belmont, CA: Wadsworth/ Thomas Learning. 张英阵(2002)方案设计与评估。草屯:内政部社会福利工作人员研习中心。
- Then the thesis puts forward a fuzzy program evaluation and review technique.The technique imports fuzzy concept into PERT. 针对产品开发的特点,提出了一种模糊计划评审技术,该技术将模糊概念引入到计划评审技术中,可提高进度计划的精确度。
- Program evaluation Evaluation of a set of interventions, marshaled to attain specific global, regional, country, or sector development objectives. 相关术语:局部评估 计划评估 计划评估是对一组开发活动的评估,旨在达到特定的 全球性、地区性、国家或部门的开发目标。
- The evaluation factors included the diameter and diameter fluctuation of nugget,the depth of dent,and the appearance of nugget as well as the weighing of each factor was assigned. 取焊点直径、焊点直径波动、压痕深度及焊点外观为评判因素集,并制定了各因素的权重分配集。
- Evaluating factor: This is a figure indicating the match condition between the calculated and real time measured spectral. 评价函数:是评价实际镀制中光谱曲线与理论曲线吻合程度的数值。
- This article estimats the risk in project plans with PERT (program evaluation and review technique) net technique.It provides a base for controlling project plans. 本文采用pert(计划评审法)网络技术对工程计划进行了风险估计,为工程计划控制提供了依据。
- This comprehensive evaluation model is based on the presupposition that evaluation results can be added together and evaluation factors are linear. 其评价思想的核心建立在评价结果可以叠加,评价因子为线性关系的假设之上。
- This paper presents a risk evaluation factors system based on operationally critical threat, asset and vulnerability evaluation (OCTAVE). 该文采用“可操作的关键威胁、资产和弱点评估”模型作为理论依据,构造出采用模型的电子政务信息系统风险评估指标体系。
- Points out that the function score, function evaluation factor and fundamental equipment cost are inaccurate in the article, which leads to erroneous cost factors and value factors and unreliable result. 指出《空调冷热源方案价值分析》一文在功能得分、能评价系数、要设备费方面的数据不够准确,使得成本系数和价值系数计算有误,因此得出了不正确的结论。