Provide fusion welding in contract with special requirements (contract requires manufacturer having quality system different from GB/T 19001 or GB/T 19002).

  • 对合同中的熔化焊接提供专门的要求(合同要求制造商具备不同于GB/T 19001或GB/T 19002的质量体系)。
目录 查词历史