您要查找的是不是:
- Pubugou Hydropower Project underground chamber 瀑布沟地下厂房
- Model Test of River Closure at Pubugou Hydropower Project 瀑布沟水电站工程截流模型试验
- Pubugou Hydropower Project and Dadu River in Development 瀑布沟水电项目和大渡河开发(英文)
- Rock Burst Prevention and Construction for Access Tunnel at Pubugou Hydropower Project 瀑布沟水电站进厂交通洞工程的岩爆防治及施工
- Practice of Regional Coordination System in Construction of Pubugou Hydropower Project 区域性协调机制在瀑布沟水电站工程建设中的实践与探索
- Construction of Pubugou Hydropower Project on Dadu River Adapt to Advanced Productivity Development 建设与先进生产力发展要求相适应的大渡河瀑布沟水电站工程
- Pubugou hydropower project 瀑布沟水电站
- Pubugou Hydropower Station (3300 MW) on Dadu River is a key project fixed in the national 10th Five-Year Plan. 大渡河瀑布沟水电站(3300 MW)是国家“十五”计划的重点工程项目。
- The study results show that the geostress of the underground powerhouse in the Pubugou Hydropower Station is prominent and has stronger directional property. 研究结果表明,瀑布沟水电站地下厂房围岩区域的构造应力显著,且具有较强的方向性。
- The Pubugou hydropower station under construction located on the middle of Dadu river-on the border of Hanyuan County and Ganluo County in the west part of Sichuan province is the fifth power station in China. 建设中的瀑布沟水电站位于四川省西部大渡河中游汉源县和甘洛县接壤处,是目前国内在建的第五大水电站。
- The calculation of PMF is very important to the safety of hydropower project, so we must pay more attention to it. 可能最大洪水计算成果关系到水电工程安全问题,必须引起高度的重视。
- Arch dam is one of foremost dam types in hydropower projects. 拱坝是水利水电工程中最重要的坝型之一。
- A dam is necessary to be detected at regular intervals after a hydropower project begins to run. 大型水利枢纽开始运行以后,需要定期进行大坝安全性检测。
- The overall process of constructing a hydropower project is the sub-period of controlling and leading flood. 摘要水电水利工程建设的总过程就是分时段对水流进行控制和疏导的过程。
- Environment Impact of cascade hydropower project is characterized with accumulating, diffusible and potential effects. 分析了梯级水电工程环境影响具有累积性、波及性和潜在性等特点。
- River Closure of Pubugou Hydropower Station on Dadu River 大渡河瀑布沟水电工程截流施工
- The analytic hierarchy process is used to evaluate the bid of hydropower project and contract management in practical duty. 结合水电工程项目招标和合同管理工作实践,应用数学理论AHP方法(层次分析法),进行水电工程项目招标评审,具有较强的针对性和实用性。
- Acceptance test of turbine model for Pubugou Hydropower Station 瀑布沟水电站水轮机模型验收试验
- Under the present favorable situation of hydropower development, it has great significance to reconsider the construction period of hydropower project. 在目前水电大开发的有利形势下,重新认识水电工程的建设工期,具有重要的现实意义。
- The Inga hydropower project could generate twice as much electricity as the world's largest dam, the Three Gorges in China. 英加水电站的发电量可能是目前世界上最大的水坝--中国三峡大坝的两倍。