您要查找的是不是:
- Requirements Change Proposal 需求更改建议
- It require change to the setup menu as show below. 它需对安装菜单做修改,如下所示。
- Initiate the change proposal for new or revised PPM. 对新的或需要进行变更的包材提出变更建议。
- Will the system requirements change for Project 2007? Project 2007的系统要求是否将发生更改?
- HTM describes the requirements and will be updated when requirements change. HTM文件描述了相关需求,当需求改变时,该文件也会被更新。
- As you move forward and your requirements change, we call in further experts to handle the emerging challenges. 当您的继续开发过程和新的挑战出现时,我们会为您根据您的需要联系新的专家进入这个小组。
- Change proposes to a bill which is being discussed in parliament. 修正案,对正在议会讨论的议案所提出的改变
- It requires change to the setup menu as shows below. 它需对安装菜单做修改,如下所示。
- Ascension requires change, and change in the physical. 提升需要改变,而改变在身体内。
- As your requirements change over time, you have the option to layer new levels of security on top of your existing framework without being forced to rearchitect the whole thing. 随着您的要求随时间而改变,您可以选择在现有框架的顶层添加新级别的安全性,而无须重新构建整个框架。
- ECP - Engineering Change Proposal 工程更改建议
- Among them, dos.cpp FIR bandpass to the source, the filter order n, the low-frequency filter FLN, the high-frequency filter fhn, window function w, in accordance with the requirements change. 共3个源程序。其中,dos.;cpp为带通FIR的源程序,其中的滤波器阶数n,滤波器的低频fln,滤波器的高频fhn,窗函数w,可以按照自己的要求改变。
- Engineering Design Change Proposal 工程设计修改建议
- Engineering Change Proposal System 工程更改建议系统
- Basis for requiring changes in or disapproving research. 不赞成该研究或认为其需要改进的依据。
- Changing the element requires changing the atomic (proton) number. 改变元素需要改变原子数(质子数)。
- Facility Engineering Change Proposal 设施工程修改建议
- If the project cannot include requirements changes, the solution meets the initial analysis but not the current customer requirements. 如果项目不能包含需求变更,那么解决方案仅满足了最初的分析,而不满足当前的客户需求。
- But putting that principle into practice might require changes to Kyoto. 但是把这一原则付诸实践可能需要修改《京都议定书》。
- Logistic Engineering Change Proposal 后勤工程更改建议