Second, the work-flow model of synchronal cooperative design is constructed.Considering the diverse phases in the work-flow, diverse correlation-based strategies for resource scheduling are proposed.
英
美
- 建立了同步协同过程的工作流模型,面向不同阶段的工作流,提出了基于关联关系的资源调度策略。
