您要查找的是不是:
- Information system cost estimation is the base of tenders. 信息系统成本测算是投标或报价的基础。
- The approach of case-based reasoning is utilized in the Cost Estimation for Plastic Injection Molded parts, A CBR model for system Cost Estimation is set up. 最佳答案(此答案并不代表本站观点)将基于实例的推理应用于注塑模具成本估算,构建了系统成本估算的CBR模型。
- System Cost Estimate 系统成本预测
- What is included in a Landed Cost estimate? Landed Cost预算包括甚么内容?
- Third, a cost estimate for the project was needed covering both the building and future running of the system. 第三,需要对系统的建设和今后的运行进行一次项目费用概算。
- Assist PM for improving reliability of project cost estimate. 负责项目的成本分析和成本控制.
- Based on that, developed a B/S structure cost estimation system. 在此基础上,开发了基于B/S结构的成本估算系统。
- How can I calculate my shipping charges for use in the Landed Cost estimate? 我怎样计算我的托运费用,以便用于Landed Cost预算?
- Receive an immediate cost estimate for your shipment before shipping. 您可以在寄件前取得即时的预估费用。
- Cost estimate of the expense portion, i. e. the equipment and materials. 费用部分,即设备和原料的成本估计。
- Parametric and bottom-up cost estimation. 参数及自下而上成本估算法。
- Your metering needs are met with best-in-class performance, reliability, and EMC at an attractive system cost. 它具有同类产品中最优的性能、可靠性和EMC特性,而系统成本仍然极具吸引力。
- Costs Estimate For Trade Marks Application in the FRANCE. 法国商标注册申请费用。
- In this method, MOSFET is selected as power components to decrease the system cost. 该方法选用MOSFET作为功率器件,降低了功率驱动单元设计的成本。
- Designed to reduce logic supply current, chip size, and system cost, the A6833 integrated circuits offer high-speed operation for thermal printers. 设计用于减少逻辑电路电源电流、芯片大小和系统成本,A6833集成电路为热感打印机提供高速操作。
- Our Landed Cost engine provides you with a cost estimate of international shipments. 我们的Landed Cost引擎将为您提供国际货件的成本估算。
- Ensuring the randomness of demand and equipment replenishment ratio, with the target of minimum system cost, the dynamic storage model was set up. 在保证随机性需求并满足一定器材保障率的条件下,以系统所需费用最小为目标,建立其动态存贮模型。
- Be responsible for cost estimate, planning, contract management and resource allocation. 负责成本控制,项目计划,合同管理及人员分配。
- In this paper, under the limit of system cost, the aseismic optimum design of pipeline system is made to make system aseismic reliability maximum. 在管网系统总投资限额条件下,以系统抗震可靠度最大为优化目标,进行管网系统的抗震优化设计。
- Your Landed Cost estimate and actual shipment charges may vary for several reasons. 您的Landed Cost预算和实际托运费用不符可能有若干原因。