The Harbor and Off-Shore parts will focus on the engineering of the major and secondary breakwater, an embankment, a quay featuring the Olympic Memorial Wall and the renovation of the shore wall.

  • 水工工程包括主防波堤,次防波堤,突堤码头,奥运纪念墙码头,护岸改造等水工工程。
目录 查词历史