The author probed into the calculation method of design storm in case of contemporaneous rainfall flood that is used in the design of township flooded field draining project.

  • 对城市排涝工程设计中采用的雨洪同期设计暴雨计算方法进行探讨,提出年最大样本法的计算思路,并建议试行该法。
目录 查词历史