The complete wall is built first, utilizing a flexible wire facing backed by geotextile, and the wall is allowed to settle (with or without surcharge).

  • 先施工整个墙体,采用柔性网面层加土工膜,无论有无超载墙体都允许沉降。
目录 查词历史