The dredging operation involves the laying of submarine cables by the grab dredging and the jet plough method within 500 metres from the nearest boundary of bathing beaches.

  • 挖泥工程包括采用抓斗挖泥和水力喷注法于最接近泳滩界线的500米内敷设海底电缆。
目录 查词历史