The engineer must analyze the existing stringers and beams for stress reversals caused by the removal of columns or walls and the positioning of the temporary support.

  • 工程师一定分析现有的横梁和为由柱或墙壁和暂时的架定位的排除所引起的应力翻转的梁。
目录 查词历史