The fully mechanized caving coal mining under the railway in mine area will result in difficult maintenance of railway because of great deformation and subsidence speed of terrene and railway.
英
美
- 在矿区铁路下进行放顶煤开采所引起的地表及铁路的变形量大,变形速度快,从而导致矿区铁路维护困难。