The key points of concrete lining construction in tunnel in winter are to control the temperature in concrete mixing process and the concrete maintenance.

  • 摘要低温季节隧洞混凝土衬砌施工的关键是控制好混凝土拌制过程的温度及混凝土的保(养)护。
目录 查词历史