The mathematics model on how to choose the backup line was constructed by means of Fuzzy Comprehensive Evaluation(FCE) and Analytic Hierarchy Process(AHP).

  • 利用模糊评判法(FCE)和层次分析法(AHP)原理建立了备份通信线路的选择模型。
目录 查词历史