The new factory has sited and is to be built in Jiangning Develorment Zone, its designed capacity is 7500T.

  • 经过近10年的努力发展,公司规模不断壮大,新厂址已在江宁开发区选定,并开始建设,设计产能为7500吨。
目录 查词历史