The paper introduced the choice and construction process of loess multi-arch tunnel middle wall,analyzed monitoring and measurement of strengthening the middle wall for reference.

  • 介绍了在黄土地区双连拱隧道中墙的选择及施工过程,并分析了如何加强对中墙的监控量测等。
目录 查词历史