The pile insertion and pullout of platform with pile shoes in the study area disturbed and damaged the surficial soil,and the shoe pits were formed after pile pullout.

  • 具桩靴平台在研究区内进行插拔桩,扰动或破坏表层土,拔桩后形成桩坑。
目录 查词历史