The retaining dike is constructed by bulldozing in warping area, then taking sand directly from the river channel using silt-sucking boat and DPB bump platform.

  • 围堤采用推土机从淤区内推土填筑,简易吸泥船和DPB电泵平台直接从河道内取沙。
目录 查词历史