The scheduling problem for one and two hoists is different, the latter involves overlapping and cannot be solved directly by means of mathematical modeling.
英
美
- 单抓钩排序问题不同于两抓钩排序问题,后者包括了有重叠区的情况,并且,无法用数学模型直接求解。