The spillway and the gate structure optimization schemes, and the design plans for the gate lifting power and the retention ability were put forward respectively.
英
美
- 通过该项研究,提出了泄水道及闸门结构优化方案及闸门启门力、持住力设计等咨询意见,并被工程采纳。