This paper analyzes hazards of changing desulfur tower packing using job hazard analysis,and makes out the count-measures to ensure the safety of construction process.

  • 运用工作危害分析对脱硫塔更换填料中的危险进行了分析,制定了相应对策,保证了施工过程的安全。
目录 查词历史