This paper deals with the problem of hot rolling scheduling in iron and steel plants,and it is treated as a multiple traveling salesmen problem with capacity constraints and a heuristic is proposed.

  • 研究了钢铁厂的热轧调度问题,将其转化为带有能力约束的多旅行商问题,并对此给出一个启发式算法.
目录 查词历史