This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.

  • 介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
目录 查词历史