This paper introduces the general situation of water conveyance project of Dahuofang Tunnel,analyzes the horizontal run-through error,and determines the effective construction survey scheme.

  • 简要介绍了大伙房隧洞输水工程的概况,重点对其横向贯通误差进行了分析,确定了有效的施工测量方案。
目录 查词历史