This paper presents the construction highlights and principal technical measures adopted in the construction of pylon pier bases of Gonghe Cable Stayed Bridge in Shenyang in winter season.
英
美
- 介绍沈阳公和斜拉桥主塔承台冬季施工的要点和实施中的主要技术措施。