This paper studies maintenance time optimization problems for equipment overhaul maintenances within a limited time interval under the condition that overhauls are incomplete maintenances.
英
美
- 文章研究了采用大修维护的设备,在有限时间区间内且在大修为不完全维护的条件下,维护时间的优化问题。