Thus, it would be beneficial to perform a leak test at some time after sterilization, possibly at the beginning of the cycle or prior to stoppering.

  • 灭菌之后、开始循环之前或全加塞之前进行泄漏测试是有益的进行泄漏测试的时间和频率是多种多样的。
目录 查词历史