Thus, the movement state of overlying strata must be taken into account to the bolted reinforcement design of rise entry affected by mining action as well as the size design of remained pillar.
英
美
- 因此,上山锚杆支护设计和煤柱尺寸的留设必须充分考虑上覆岩层的运动状态。