To lower prices and difficulties,an experiment to optimize the left diversion wall of the spillway on the right bank of a certain water hinge in Shanxi has been done.
英
美
- 为降低工程造价和施工难度,陕西某水利枢纽右岸溢洪道左导墙进行了优化定型实验。