To obtain hydraulic conductivity (HC) is the basis to forecast water-gushing and HC can not be determined by pumping test on a large scale for tunnels with superthick overburden.
英
美
- 围岩渗透性是涌水预测的基础,对于超深隧道,不能通过大规模抽水试验来获得渗透性参数。