您要查找的是不是:
- Tung Chung Road at Pak Kung Au and near Cheung Sha. 伯公坳及近长沙之东涌路。
- Distribution: Cape D'Aguilar, Tung Chung. 地理分布: 鹤咀、东涌。
- Between Tung Chung and Ngong Ping on the Lantau Island. 大屿山东涌和昂坪之间。
- It comprises two services-the Airport Express Line and the Tung Chung Line. 这条铁路提供两项服务,即机场快线及东涌线。
- WWF staff investigating pollution in the Tung Chung River on Lantau. 本会职员调查大屿山东涌河的污染情况。
- Moderate southwesterly winds. API Central/Western District 22, Tung Chung 23. 吹和缓西南风;空气污染指数中西区22;东涌23.
- Tung Chung Road between Lung Tseng Tau and Cheung Sha on the Lantau Island. 大屿山东涌道,于龙井头与长沙之间的一段。
- Tung Chung town centre is the retail, commercial and cultural core of the new development. 东涌市中心将会成为新市镇零售、商业及文化活动的核心地带。
- The newly constructed Tung Chung Police Station was in place to serve an expected population of 150 000 residents. 新的东涌警署已经落成启用,为预计会达15万的居民提供服务。
- The two urban development areas, at Tung Chung and Tai Ho, will have a total target population of 320 000 by 2011. 新市镇由两个分别位于东涌及大蚝的市镇发展组成,预期到二零一一年总人口将达32万。
- The two urban development areas,at Tung Chung and Tai Ho,will have a total target population of 320 000 by 2011. 新市镇由两个分别位于东涌及大蚝的市镇发展组成,预期到二零一一年总人口将达32万。
- Tung Chung town centre is the retail,commercial and cultural core of the new development. 东涌市中心将会成为新市镇零售、商业及文化活动的核心地带。
- Proposals to build 1171 quarters in Tung Chung,Tuen Mun and West Kowloon Reclamation are at the planning stage. 拟于东涌、屯门及西九龙填海区兴建1171个宿舍单位的建议初步已获采纳,现已踏入筹划阶段。
- The relocation of the airport to Chek Lap Kok and the development of the Tung Chung new town required additional road links between Lantau and the urban areas. 香港需要新的交通网络,以接驳迁往赤苍角的机场及促进东涌新市镇的发展。
- The $34 billion Airport Railway is an integral part of the transport links to connect the urban areas with the new airport and the Tung Chung new town. 耗资340亿元的机场铁路,是连接市区和新机场及东涌新市镇的重要运输联系。
- The Airport Railway comprises two services. They are Tung Chung Line and Airport Express Line. 机场铁路提供两条服务路线,分别是东涌线和机场快线。
- Proposals to build 1171 quarters in Tung Chung, Tuen Mun and West Kowloon Reclamation are at the planning stage. 拟于东涌、屯门及西九龙填海区兴建1171个宿舍单位的建议初步已获采纳,现已踏入筹划阶段。
- The road improvement works on Tung Chung Road will improve the safety and capacity of the road. 这工程将会改善该路段的容车量及交通安全。
- Tung Chung Line started operation in mid 1998 connecting Hong Kong with Tung Chung on Lantau Island. 东涌线在1998年中开始运作,连接香港与大屿山东涌。
- Tung Chung is the ninth new town in Hong Kong and is planned to provide support services for the Airport. 东涌新市镇是香港第九个新市镇,并已规划为机场支援社区。