Under the unsteady soil and great amount of groundwater seepage flow in the Gobi De-sert, the foundation consolidation method for driving and pipe jacking construction was introduced.
英
美
- 介绍了在戈壁土土质不稳定和地下水渗流量大的情况下,进行人工掘进顶管施工的基础加固方法。