Wang Feng, Yu Erkeng, Yan Chengshan et al.Study of short-term load forcasting based on influencing factors[J].Proceedings of the CSEE,1999, 19(8): 54-58.

  • [8]汪峰;于尔铿;阎承山;等.;基于因素影响的电力系统短期负荷预测方法的研究[J]
目录 查词历史