Weekly operational checks should be carried out at 320MW in presence of shift charge Engineer. Test should be completed before system peak load period.
英
美
- 每星期在值长在场的情况下,机组负荷达到320MW时,进行操作检查。测试应在系统带尖峰负荷前完成。