With the design and construction conditions of Suzhoujie station,the author analyzes and studies the construction methods with PBA underground cut construction method in metro station.
英
美
- 结合苏州街站的设计与施工情况,对地铁车站使用PBA法暗挖施工时的施工工法进行了分析研究。