您要查找的是不是:
- pile foundation of high piled wharf 高桩码头桩基
- Analysis in Improving Earthquake Resistance Ability of High Pile Wharf by Viscoelasticity Connection 采用粘弹性连接改善高桩码头抗震性能分析
- high pile wharf 高桩码头
- Simplified Calculation of Load on Tongue-grooved Section Joints of A High Piled Wharf Under Transversely Concentrated Horizontal Force 高桩码头在横向集中水平力作用下齿槽受力的简化计算
- The damage status of pile caps is investigated for piled wharf. 摘要调查了高桩码头桩帽破损情况;
- high piled wharf 高桩码头
- The covered type of sheet pile wharf as a new type wharf is still lack of perfect design and construct norms. 遮帘式板码头作为新型的码头结构型式尚没有完善的设计与施工规范,原型监测显得尤为重要。
- In this paper, static load experiments are illustrated and the reliability of CFRP reinforcement technology, used for reinforcing beam slab structure of large span bridge, is discussed. 文章结合对大跨度桥梁的梁板结构加固处理前后的静载试验,探讨了大跨度梁板结构应用粘贴碳纤维加固处理技术的可靠性。
- high piled beam - slab structure 高桩梁板式
- There is a serious sediment deposition in the wharf apron of an alongshore pile wharf. 摘要顺岸式桩基码头前沿会发生较??严重的泥沙淤积。
- Combined with the construction experience,the paper analyzed the cause of blow-up cracks for post-tensioned concrete beam slab,and proposed relative treatment measures for reference. 结合相关工程的经验,对在严寒地区已交付使用或正在施工过程中的后张法预应力混凝土梁板产生的纵向冻胀裂缝的原因进行分析,提出预防和处治措施,供有关设计和施工单位参考。
- Combined with practical work,from setting isolation layer,installation of formwork,duck leakage and other aspects the problems existed in prefabrication of prestressed beam slab are pointed out. 根据施工实践,从隔离层的铺设、模板的安装、孔道漏浆、梁板封锚混凝土等方面提出了预应力梁板预制中存在的问题,分析了其产生原因,介绍了预防措施,以提高其预制质量。
- So correlation production of variety of flow velocity and calculating the siltation volume alongshore pile wharf is summarized. 本文总结了在桩基码头水流变化和泥沙淤积计算方面的相关研究成果。
- The technology of prestressed no beam slab with no expansion joint was applied in LongYan children's playground.This paper analysized and summarized the measures of crack controlling in this roof. 龙岩儿童乐园超长顶板采用预应力无梁平板,不设伸缩缝,本文对该顶板的抗裂控制的措施和经验进行了分析和总结。
- In this paper,static load experiments are illustrated and the reliability of CFRP reinforcement technology,used for reinforcing beam slab structure of large span bridge,is discussed. 文章结合对大跨度桥梁的梁板结构加固处理前后的静载试验,探讨了大跨度梁板结构应用粘贴碳纤维加固技术处理的可靠性。
- Info:100% polyester pile fabrics: super micro polyester pile, acrylic boa, acrylic high pile, sherpa End Used: toys, garment and decorative articles. 主要材质:涤纶次要材质:其它克重:其它幅宽:其它用途:家纺用织物
- Based on the research for the damage characteristics and specific structure of pile wharf, a multi-level assessment model with indexes level, criteria level and target level is established. 摘要在研究高桩码头耐久性损伤特点及其结构特征的基础上,建立了包括指标层、准则层和目标层的多层次评估模型;
- Finally the durability grade of pile wharf and its components is evaluated comprehensively by taking the grey relation grade as the criteria, which provides a basis for the evaluation. 最后以灰色关联度为准则对在役高桩码头构件和结构的耐久性进行综合分级评估,为工程人员鉴定、评估提供依据。
- hollow-- eore and non-- beam slab 空心无粱楼盖
- High pile delivery (standard Press without PQC) Availability Immediately Photographs enclosed.Machine is in excellent running condition and can be seen in production. 机器情况: KOMORI LITHRONE L426 S 4-COLOUR OFFSET PRESS Komorimatic Dampening Units Cooling and circulation Remote Plate Register Weko Powder Spray.