您要查找的是不是:
- B. Flush test cocks before test. 在检测之前冲洗测试旋塞。
- Flush test cocks before testing. 在检测之前冲洗测试旋塞。
- I need to bone up on the French grammar before test. 考前我得啃一下法语的语法。
- Remove relay from connector before testing. 在测试前,从接头拆卸继电器。
- Test all the electric and electronic parts of the system before test operation of the whole system . 在试运行之前请对系统的所有电气和电子组成部分按照说明进行测试。
- A. Before starting test, all needle valves and bleed valves on test kit must be closed. B. Flush test cocks before test. 在开始检测之前,检测组件上的所有针形阀和排放阀都必须关闭。B.;在检测之前,冲洗测试旋塞。
- embolism pre- test probability score 预测评分
- A fault-class ambiguity sets determination algorithm based on the Simulation Before Test (SBT) approach is proposed for the fault diagnosis of analog circuits. 摘要提出了一种在模拟电路故障诊断中故障类模糊集的确定算法。
- The switch wire harness must be disconnected before testing switch continuity. 在测试导通性之前必须断开开关线束。
- Flush test cocks before test. 在检测前冲洗测试旋塞。
- Ability knows whether his body is healthy. Whether can assay blood know! Does blood need laboratory test probably how many money? Is every hospital OK assay? 怎样才能知道自己的身体是否健康。化验血是否可以知道呢!化验一次血大概需要多少钱?每个医院都可以化验吗?
- When the sample was subjected to high temperature for a long time before test, its co-continuous structure would be easily coarsened and disintegrated under the driving of interfacial tension. 试样在测试前长时间处于高温熔体状态时,其共连续结构很容易在界面张力的驱动下发生粗化和破碎,所以得到的共连续反而变窄。
- As a matter of fact, I've never been there before. 事实上我从未到过那儿。
- We started early in order to arrive before dark. 为了在天黑前到达,我们很早就动身了。
- Putonghua proficiency test should take in and learn from the theory of phoneme, break through the tutor before test and try hard to summarize flexible and proficient test method in different period. 普通话测试应借鉴音位理论,制定科学的词汇规范标准;突出考前辅导的作用,大力宣传科学健康的用词理念;倡导“与时俱进”的探索精神,努力总结灵活有效的测试方法。
- Before testing this method on patients,Dr. Bliss carried out tests for two years on two hundred dogs. 布利斯医生把这种疗法用于病人之前,曾在200条狗身上进行了为期二年的试验。
- Before testing this method on patients,Dr.Smith carried out tests for two years on300 dogs. 史密斯医生在对病人试用这个方法以前已在300条狗身上做了两年的试验。
- Before testing the workload management, it is useful to verify that the clones are working individually. 在测试工作负荷管理之前,有必要先分别检验一下各个克隆是否在工作。
- Before the use of BitKeeper and snapshots came about, testers had to wait for releases before testing could begin. 在没有使用BitKeeper和快照时,测试人员不得不等到内核发布后才可以开始测试。
- On this page, you can select scripts to be run before tests are run, and after tests are run, respectively. 在此页上,可以分别选择要在运行测试之前和运行测试之后运行的脚本。